Skip to content
Mining & quarry machinery for Australian projects
AboutResourcesSupport
BAICHY.

Mining & quarry equipment / Australia

Dry Magnetic Separator in Australia

Develop a dry magnetic-separation enquiry around representative feed, particle-size distribution and the required split between product streams.

Baichy Dry Magnetic Separator

Select the image for a closer look.

Project selection

Choose the right configuration.

Describe moisture variation, dust and feed consistency, then ask whether additional preparation is needed for the proposed separation. Request testwork that measures product quality and mass distribution. Review feed presentation and dust-handling interfaces alongside the separator so the proposed result relates to an operable site arrangement.

For an Australian project, include the site location and delivery access in the technical brief. Request a written scope identifying the proposed configuration, installation interfaces and services required from the purchaser. Compare quotations against the same duty, and ask for current drawings and datasheets that match the exact equipment being offered.

Use the enquiry form to share details of your feed samples, moisture range, separation objective and dust-handling arrangement. Add your site location, project stage and preferred timing. If you are still gathering technical information, tell us what you have so far. We can help identify what is needed for the next assessment.

Before you request a quote

  • Dry-feed condition and size distribution
  • Separation test results and product target
  • Feed presentation and dust interfaces

The details that matter

Compare models. Specify with confidence.

Request the current model schedule and dimensional drawings for your proposed configuration.

Specifications are based on published manufacturer information. Capacity depends on material and configuration. The downloadable PDF is a website summary; request current manufacturer drawings and the configured supply scope before ordering.

Download project selection brief

Questions about Dry Magnetic Separator

Can a wet-separation result be used to size a dry separator?

Ask for a technical assessment and testing relevant to the proposed dry feed conditions. Different preparation and operating arrangements should not be assumed to produce the same outcome.

What should the product objective state?

Specify the required concentrate or cleaned-product quality and how remaining material will be handled. Request test results showing the mass and quality of each proposed output stream.

Across Australia

Your project. Your part of Australia.

Equipment enquiries for Perth, Brisbane, Sydney, Melbourne, Adelaide, Hobart, Darwin, Canberra and regional project locations. Tell us where your site is so freight, access and installation requirements can be assessed.

Western Australia (WA) stylised icon

Perth

Western Australia (WA)

Regional project locations

Albany, Bunbury, Busselton, Geraldton, Kalgoorlie–Boulder, Karratha, Mandurah, Port Hedland, Broome

Queensland (QLD) stylised icon

Brisbane

Queensland (QLD)

Regional project locations

Cairns, Gold Coast, Sunshine Coast, Townsville, Toowoomba, Mackay, Rockhampton, Bundaberg, Gladstone, Mount Isa, Hervey Bay, Ipswich

New South Wales (NSW) stylised icon

Sydney

New South Wales (NSW)

Regional project locations

Newcastle, Wollongong, Albury, Armidale, Bathurst, Broken Hill, Coffs Harbour, Dubbo, Goulburn, Griffith, Lismore, Orange, Port Macquarie, Tamworth, Wagga Wagga

Victoria (VIC) stylised icon

Melbourne

Victoria (VIC)

Regional project locations

Geelong, Ballarat, Bendigo, Mildura, Shepparton, Warrnambool, Wodonga, Wangaratta, Latrobe Valley

South Australia (SA) stylised icon

Adelaide

South Australia (SA)

Regional project locations

Mount Gambier, Whyalla, Port Augusta, Port Lincoln, Port Pirie, Murray Bridge

Tasmania (TAS) stylised icon

Hobart

Tasmania (TAS)

Regional project locations

Launceston, Devonport, Burnie

Northern Territory (NT) stylised icon

Darwin

Northern Territory (NT)

Regional project locations

Alice Springs, Katherine, Palmerston, Tennant Creek

Australian Capital Territory (ACT) stylised icon

Canberra

Australian Capital Territory (ACT)

Regional project locations

Canberra region

Delivery, availability and service scope are confirmed for each quotation.

Explore the same equipment family

Mineral ball milling

34 published models

Baichy Energy Saving Ball Mill

Energy Saving Ball Mill

Flotation separation

11 published models

Baichy Flotation Cell Machine

Flotation Cell Machine

Slurry classification

7 published models

Baichy Spiral Classifier

Spiral Classifier

Your next project starts here

Tell us about your project.

Your equipment is already selected when you enquire from a product page. Add your contact details and a short message, and we can work through the requirements with you.

01 / Select your equipment

02 / Tell us what you need

03 / Discuss your project

By sending this enquiry, you agree to be contacted about your request. Privacy notice

Project enquiry

Request a quote

By sending this enquiry, you agree to be contacted about your request. Privacy notice

Image detail

Zoom, then drag to inspect. Use + / - to zoom, arrow keys to pan, and Esc to close.

Keep your team in the loop

Share this page

BAICHY

Choose your language

Choose the language you would like to use.

You can change your language at any time using the menu.