
Perth
Western Australia (WA)
Regional project locations
Albany, Bunbury, Busselton, Geraldton, Kalgoorlie–Boulder, Karratha, Mandurah, Port Hedland, Broome
Mining & quarry equipment / Australia
Assess a self-unloading iron remover against the conveyed material, belt arrangement and the unwanted ferrous items the process needs to address.
Select the image for a closer look.
Project selection
Provide belt width, speed, material-bed information and examples of the metal to be removed. Ask for the proposed mounting position, operating arrangement and collection route. Check clearance around the unit and the receiving area for removed material so the separator does not create an unresolved handling point above the conveyor.
Include the Australian site and receiving arrangements when submitting the technical brief. Ask the supplier to identify equipment, auxiliaries, interfaces and purchaser-supplied services in one written proposal. Review the current drawings against available space and material flow, then resolve model-specific questions before treating a preliminary configuration as the final equipment specification.
Use the enquiry form to share details of your conveyor data, material-bed depth, target metal examples and mounting space. Add your site location, project stage and preferred timing. If you are still gathering technical information, tell us what you have so far. We can help identify what is needed for the next assessment.
The details that matter
| Machine Model | Belt Width (mm) | Rated Height (mm) | Material Thickness (mm) | Magnetic Strengh (Mt) | Motor Power (kw) | Belt Speed (m/s) | Working System | Weight (kg) | Enquire |
|---|---|---|---|---|---|---|---|---|---|
| RCYD-5 | 500 | 150 | 100 | 65 | 1.5 | 2.5 | Continuous | 750 | Request quoteRCYD-5 |
| RCYD-6.5 | 650 | 200 | 150 | 70 | 1.5 | 2.5 | Continuous | 1200 | Request quoteRCYD-6.5 |
| RCYD-8 | 800 | 250 | 200 | 70 | 2.2 | 2.5 | Continuous | 1400 | Request quoteRCYD-8 |
| RCYD-10 | 1000 | 300 | 250 | 70 | 3.0 | 2.5 | Continuous | 2120 | Request quoteRCYD-10 |
| RCYD-12 | 1200 | 350 | 300 | 70 | 4.0 | 2.5 | Continuous | 3350 | Request quoteRCYD-12 |
| RCYD-14 | 1400 | 400 | 350 | 70 | 4.0 | 2.5 | Continuous | 4450 | Request quoteRCYD-14 |
| RCYD-16 | 1600 | 450 | 400 | 70 | 5.5 | 2.5 | Continuous | 6200 | Request quoteRCYD-16 |
| Request a quote for your model | |||||||||
Specifications are based on published manufacturer information. Capacity depends on material and configuration. The downloadable PDF is a website summary; request current manufacturer drawings and the configured supply scope before ordering.
Define the actual contaminants for technical review. Ask the supplier to explain what the proposed unit is intended to remove and whether other detection or separation equipment is required.
Supply belt dimensions and speed, burden depth, route drawings and photographs. Identify available mounting space and where removed metal can be collected without interfering with operations.
Across Australia
Equipment enquiries for Perth, Brisbane, Sydney, Melbourne, Adelaide, Hobart, Darwin, Canberra and regional project locations. Tell us where your site is so freight, access and installation requirements can be assessed.

Western Australia (WA)
Albany, Bunbury, Busselton, Geraldton, Kalgoorlie–Boulder, Karratha, Mandurah, Port Hedland, Broome

Queensland (QLD)
Cairns, Gold Coast, Sunshine Coast, Townsville, Toowoomba, Mackay, Rockhampton, Bundaberg, Gladstone, Mount Isa, Hervey Bay, Ipswich

New South Wales (NSW)
Newcastle, Wollongong, Albury, Armidale, Bathurst, Broken Hill, Coffs Harbour, Dubbo, Goulburn, Griffith, Lismore, Orange, Port Macquarie, Tamworth, Wagga Wagga

Victoria (VIC)
Geelong, Ballarat, Bendigo, Mildura, Shepparton, Warrnambool, Wodonga, Wangaratta, Latrobe Valley

South Australia (SA)
Mount Gambier, Whyalla, Port Augusta, Port Lincoln, Port Pirie, Murray Bridge

Tasmania (TAS)
Launceston, Devonport, Burnie

Northern Territory (NT)
Alice Springs, Katherine, Palmerston, Tennant Creek

Australian Capital Territory (ACT)
Canberra region
Delivery, availability and service scope are confirmed for each quotation.
Your next project starts here
Your equipment is already selected when you enquire from a product page. Add your contact details and a short message, and we can work through the requirements with you.
01 / Select your equipment
02 / Tell us what you need
03 / Discuss your project